Profile

Settings

Loading…

← Papers

Help

FAQ

Which features require signing in?

You can read the commentary, paper info, Model Structure and related papers of public papers without signing in. Sign in to manage your account or contact us about your inquiries.

Can I upload a PDF file?

Upload papers with an arXiv or DOI link; the commentary is public to everyone. Papers whose source and terms of use can't be verified, so the commentary can't be made public, can't be uploaded. Uploading PDF files and keeping papers private are for subscribers only, and a paper uploaded as a file is saved as private only. Searching for official info by title runs only when you press the button.

Are the figures and AI commentary accurate?

Figures come only from the original paper, and only those whose terms of use are verified are shown. The commentary is written by AI and may be wrong. Check important claims, numbers and figure context against the evidence in the original paper.

I want to report a copyright issue.

Terms of use and the source of the original paper are on the Paper info tab. If there's a problem, choose "Paper content, figures and copyright" under Contact us and send the paper link, the part in question, and evidence that you hold the rights. Receiving your report doesn't confirm any rights or remove anything right away. You can see the result of the review under My inquiries.

I forgot my password.

If you signed up with email, use Forgot password in the sign-in window to reset it with your verified email. If you signed up with Google, Naver or Kakao, change your password with that service.

What should I include in an inquiry?

Tell us which screen you were on and what you were doing when the problem happened, along with the paper link. Don't include personal information such as passwords, API keys, verification codes or phone numbers. Inquiries and replies are stored in Refivu and you can see them under My inquiries.

How do I delete my account?

In Settings, under My account, press Delete account. Review what will be deleted and complete identity verification to delete your account. For other requests, choose "Account" under Contact us.

Paper commentary

Speed-to-Power Dominates Energy Costs for AI Data Centers: Technoeconomic Analysis of Powering AI in the Continental United States

Speed-to-power, not energy price, decides how AI data centers should get power

  • Problem Grid interconnection queues and gas turbine backlogs delay AI data centers by years. Energy cost comparisons ignore the GPU compute lost while a facility waits to be built.
  • Method The authors add the value of compute lost during construction to each option's levelized cost of energy. Options are ranked by that speed-adjusted sum across U.S. locations.
  • Results DC-coupled solar becomes the lowest-cost option in 84.9% of U.S. locations once lost compute is counted. Without that adjustment, grid interconnection usually wins on energy cost alone.

Figure 1: Analytical framework.For a given quantity of chips, workload (in this research empirically
calibrated to AI training) and location (climate, solar re…

Figure 1 : Analytical framework.For a given quantity of chips, workload (in this research empirically calibrated to AI training) and location (climate, solar resource, gas price, grid rate, and interconnection queue), we build an hourly facility load combining IT demand with climate-driven cooling (PUE). We then size and dispatch three islanded architectures, AC solar+storage, DC solar+storage, and islanded natural gas with diesel backup, and compare them against grid interconnection. Each deliver equivalent energy service at equivalent reliability through an explicitly modeled power-conversion path. Each option is assessed on two axes: its unadjusted levelized cost of energy ($/kWh) and the value of compute forgone during construction (set by deployment speed and chip-hour value). Their sum, a speed-adjusted cost (LCOEadj), determines the preferred option, which varies with location, scale, technology, and the value of time.

Original paper · CC BY 4.0 · Alex C. Newkirk, Daniel L. Gerber, Erica R. H. Fuchs, Alex Hubbard, M. Granger Morgan, Arman Shehabi, Sarah J. Smith, Constantine Samaras · Speed-to-Power Dominates Energy Costs for AI Data Centers: Technoeconomic Analysis of Powering AI in the Continental United States · Original paper figure · Extracted the figure area from page 5 of the original PDF.

Why power timing now outweighs power price

AI data centers now run at the scale of hundreds of megawatts, and some announced projects reach the scale of gigawatts. Firms want this capacity fast, because they prioritize deployment speed over other considerations to avoid falling behind competitors. The legacy electricity system moves much more slowly than this urgency, since utility planning and permitting were built for nearly two decades of flat consumption.

Grid interconnection queues, the delay before large loads can connect, are rising and exceed 5 years in some regions. Equipment adds to the delay, because grain-oriented electrical steel, grid transformers and high voltage circuit breakers often have multi-year backlogs. Firms respond by signing exclusive power purchase agreements, and some build their own power, operating partially or fully islanded from local grids.

For these firms, the question is therefore less about the cheapest kilowatt-hour and more about which power source is ready first.

Waiting has a direct cost, because each month of construction is a month of GPUs that produce no output. That work didn't price speed against energy cost across architectures, and the paper's own framework fills that gap. The DC versus AC question for solar and storage was studied separately from data centers, and no work had combined the two.

To value this delay, the authors price the compute forgone during construction at the $2.40/GPU-hour H100 rental index price. This rental price is the floor utility of the marginal GPU-hour, because an operator who can't earn at least this value should rent compute to the market. Eq. 1 sums the idle GPU-hours in each pre-operational year, multiplied by the number of GPUs and the spot price.

Because this value enters the cost during construction, a standard levelized cost, which counts only costs and delivered energy, can't see the delay.

A speed-adjusted cost for each option

The speed-adjusted cost adds the value of compute lost during construction to each option's levelized cost of energy, then ranks the options by that sum. Each option therefore carries two numbers: an unadjusted LCOE in $/kWh and a forgone-compute value set by how long the option takes to build.

The forgone value is built year by year, multiplying the idle GPU-hours in each pre-operational year by the spot rental rate and the GPU count. The authors price each idle GPU-hour at $2.40, the H100 rental index price in year-0 dollars. That rate works as a floor, because a firm training frontier models may value a GPU-hour well above its rental price.

For firms running only proprietary training, the spot price likely understates the value of compute.

LCOEadj divides the discounted sum of capital, operating and lost-compute costs by the discounted sum of delivered energy. Both sums use a 7% base-case discount rate with mid-year discounting, and n is the evaluation year shared by every scenario. Solar-plus-storage systems follow a 24-month construction timeline, so their lost-compute term stays short.

Grid interconnection uses each state's 2018-2023 median queue duration, so a 5-year wait costs 3 years of operation against 2-year solar construction.

To test how robust the ranking is, the authors vary the GPU value from $1.00 to $4.00 per hour. They also shift the construction timelines by ±50%, then check whether the selected architecture changes.

Four supply paths built to the same load

The load is a fleet of 8-H100 node equivalents with an average draw of 7.3 kW and a maximum of 8.5 kW. A 100,000-GPU facility therefore has a design load of about 131 MW, and the power systems are sized to that peak. Cooling enters through hourly PUE from Lei and Masanet's framework, using the minimum annual PUE for the location. Power systems are sized to the maximum IT load times the 99th percentile PUE and a 1.05 contingency factor.

Every path must meet the load in 99% of hours, and the remaining hours count as unserved.

PV panels make DC power, so the AC design needs an inverter and a transformer before the grid can take the output. In the AC design, storage shares the PV inverter, while in the all-DC design it is centralized off the ±10 kV spine. The all-DC medium-voltage layout steps 1500 V DC blocks up to ±10 kV for the campus, then steps down within the data hall to a ±400 V bus.

The AC layout instead distributes power at 34.5 kV and then 480 V AC, the conventional path that grid and gas plants also use. Figure 2 shows these candidate medium-voltage power-flow paths with their modeled component efficiencies.

The battery is a 4-hour LFP system built from 60 MW packs that store 240 MWh, and dispatch sends surplus solar to the battery before any curtailment. Degradation follows BLAST-Lite for LFP and a linear solar fade of 1% in year one and 0.55% a year after that. Battery replacement happens once, at year 13, while the PV modules have a 25-year life and the model runs to year 27.

Gas plants choose from 16 reference turbines, with part-load penalties and ambient derating included. Backup diesel covers minimum facility power, sized to match the gas plant's expected unserved energy.

Turbine delivery at 36 months can limit the gas timeline, because 30% of construction waits on it. Grid interconnection uses each state's 2018-2023 median queue duration from supply-side data.

DC coupling saves on hardware, not on rates

On average, the all-DC design runs about 18% cheaper than its AC counterpart, close to 9 cents per kWh. In the Permian Basin, a 100,000-GPU facility of about 131 MW gets energy at $0.27/kWh from the all-DC microgrid. The AC system costs $0.33/kWh for the same load, so the gap works out to $0.062/kWh. The authors trace the gap to avoided hardware, namely eliminated inverters and higher path efficiency.

The DC advantage shifts from site to site, since the share of energy flowing directly from PV to load differs. Across the 5th to 95th percentile range, levelized cost spreads by roughly $0.40/kWh within each PV architecture. The worst five-day insolation window explains this spread better than annual sunlight does. A dry interior-West Colorado site comes in at $0.21/kWh, while a fog-prone northern-California site reaches $0.61/kWh.

Natural gas behaves differently, because its costs fall as facility capacity grows. Small aeroderivative plants at 10 to 20 MW reach $0.25 to $0.30/kWh. In eastern Colorado at $7.70/MMBTU, gas reaches cost parity with DC microgrids near 30 MW. A higher gas price moves this crossover toward larger facilities, while cheaper gas pulls it toward smaller ones.

Gas costs drop by $0.15/kWh across the range of system scales plotted in Figure 4.

PV+BESS costs barely move with nameplate capacity, staying within ±$0.002/kWh. Low-voltage layouts cut costs by a median 2.4% for DC and 3.7% for AC against medium-voltage counterparts.

Counting lost compute changes the winner

Once lost compute enters the cost, DC-coupled solar becomes the lowest-cost option in 84.9% of U.S. locations. Without that speed adjustment, grid interconnection generally beats the microgrids on unadjusted LCOE. The speed edge comes from a 24-month solar-plus-storage build, while grid interconnection can take 4 to 5 years. Lost compute is priced as idle GPU-hours multiplied by a spot rental rate of $2.40 per GPU-hour.

Grid connection wins in Maine, where the nation's fastest interconnection timeline offsets moderate electricity prices. NYISO's longer interconnection queue makes DC solar preferable in upstate New York, despite moderate utility rates. East Texas and Georgia each pair industrial electricity below 6¢/kWh with three-year interconnection. Gas rarely wins, because gas prices and grid electricity costs tend to move together in most markets.

When gas turbine microgrids come online after three years, the split becomes 55.6% DC solar, 35.2% natural gas, and 9.2% grid. DC solar keeps a majority of U.S. locations even under that accelerated gas timeline, which assumes 36-month turbine delivery. Lost compute also sets an indifference threshold: the chip-hour value at which a firm is indifferent between DC microgrids and grid interconnection.

That threshold falls below $1.00/hr in high-insolation regions and rises above $4.00/hr in solar-poor locations. The median is $1.61 per chip-hour, under the $2.40/hr baseline.

Reliability adds value too: moving from 90% to 99% uptime is worth about $0.20/kWh in avoided lost compute. The step from one to two nines clears the threshold in every DOE climate zone tested except Seattle, WA. They didn't find that compute value alone justifies moving to 99.9% uptime at any location.

Which assumptions move the answer

Solar costs climb with availability, because each extra nine of uptime requires more installed capacity. Gas costs move the other way, since fixed capital spreads over more operating hours at higher utilization. The authors compare this to macro grids, where infrastructure is scoped for the worst-case scenario.

For fixed designs, gas cost is driven mainly by fuel price rather than by discount rate or capital cost. Across the continental U.S., from Oklahoma to California, gas cost spreads by $0.08 to $0.11/kWh. Solar plus storage cost responds most strongly to the discount rate, varying 27% to 43% across rates of 3% to 12%. Land cost is negligible; it would need a sixfold increase to match battery O&M, the next lowest influence.

Only facilities of 180 MW or more in high-fuel-price regions adopt combined cycle, which can hedge fuel-price risk.

Internal power-system choices change LCOE less than the choice of architecture does. Routing the full IT load through online double-conversion adds about 5.9% to base LCOE, or 6.4% when cooling is also conditioned. The all-DC advantage splits into a path-efficiency part near 7.9% and a roughly equal avoided-capital part.

The authors size systems on typical meteorological year data, which they call a mildly optimistic sizing basis. Re-optimizing against each historical year from 2010 to 2023 puts TMY-based designs a median 4.5% ($0.012/kWh) below the historical mean. Stitched typical months tend to trim the worst stretches, so the designs may modestly undersize solar plus BESS.

Propagating each state's historical price dispersion through a committed gas plant moves LCOE within $0.005 to $0.024/kWh, with a median of $0.011/kWh.

Where the numbers stop applying

The grid case is best read as a floor, because the model leaves out some costs that large loads can trigger. Utilities usually pay these costs but recover them through rates, which shifts part of the bill onto other ratepayers. Interconnection timing uses regional median supply-side queue durations from [13] as a proxy for large-load requests.

State-level aggregation hides intrastate differences in queue congestion, and demand-side requests may move differently from supply-side ones.

The design relies on typical meteorological year data, which the authors call a mildly optimistic sizing basis. Re-optimizing on each year from 2010 to 2023 puts TMY a median 4.5% ($0.012/kWh) below the historical-year mean. Single-location TMY datasets mean neighboring sites with similar climates can diverge, especially where spatial climate varies sharply.

The DC design assumes mature supply chains that, in some cases, don't yet exist at scale. Integrated performance at 100+ MW still needs empirical validation, since the component values come from datasheets.

The 9¢/kWh average DC advantage is an expected value, so early projects may capture only partial gains. Trade or geopolitical disruptions to PV modules or LFP cathodes would delay deployment, and the model doesn't include them. Natural gas uses state-level industrial prices as uniform proxies, so a facility near a pipeline hub may face lower costs.

The authors didn't model nuclear, advanced geothermal, wind, reciprocating engines or mixed portfolios, leaving them to future work. The uptime target treats the load as non-reactive, so it serves as a conservative lower bound on achievable reliability. Battery residual value is left out, even though modules at mid-scenario replacement keep 89% state-of-health on average.

Paper info

Authors
Alex C. Newkirk, Daniel L. Gerber, Erica R. H. Fuchs, Alex Hubbard, M. Granger Morgan, Arman Shehabi, Sarah J. Smith, Constantine Samaras
Venue
arXiv · Preprint
First published
2026-11-12
Added
2026-11-14
Updated
2026-11-12
Version
v1
arXiv
2611.17098
Category
cs.AI · eess.SY
Original paper terms
CC BY 4.0
What we show
Paper info, commentary and permitted figures from the original paper

AI commentary is a separate explanation from the original paper and may contain errors. The original paper and figures follow each source's terms of use and any rights noted separately.

Abstract

The rapid growth of artificial intelligence is driving demand for new data centers at large scale and on short deployment timelines. To power them, firms connect to the commercial grid or contract generation directly, but interconnection and gas-turbine delays now incentivize on-site generation. We compare grid-connected and off-grid data center energy infrastructure (AC- and DC-coupled solar-plus-storage, islanded natural gas, and grid interconnection) across the continental U.S. Using an open-source technoeconomic framework built on empirically calibrated AI training loads, climate-driven cooling, stage-by-stage power conversion, and physics-based battery degradation, we model designs providing equivalent energy services. Our central contribution is a speed-adjusted cost of energy that values the compute unlocked by faster construction, making options with different deployment timelines directly comparable on one physically consistent basis. We find DC coupling reduces lifetime energy costs by 18% ($0.09/ kWh) on average versus AC counterparts by eliminating inverters and improving efficiency. Though rarely cheapest on unadjusted energy cost, DC-coupled microgrids' faster deployment makes them the lowest-cost modeled option in 85% of U.S. locations once foregone compute is valued, or 55% under accelerated natural gas timelines. For AI infrastructure, deployment speed rather than unit energy cost determines the economically preferred path to power.

Figures from the paper

Quote from the paper

Alex C. Newkirk, Daniel L. Gerber, Erica R. H. Fuchs, Alex Hubbard, M. Granger Morgan, Arman Shehabi, Sarah J. Smith, Constantine Samaras (2026). Speed-to-Power Dominates Energy Costs for AI Data Centers: Technoeconomic Analysis of Powering AI in the Continental United States. arXiv:2611.17098v1. https://arxiv.org/abs/2611.17098v1

BibTeX
@misc{newkirk2026speed,
  title = {{Speed-to-Power Dominates Energy Costs for AI Data Centers: Technoeconomic Analysis of Powering AI in the Continental United States}},
  author = {Alex C. Newkirk and Daniel L. Gerber and Erica R. H. Fuchs and Alex Hubbard and M. Granger Morgan and Arman Shehabi and Sarah J. Smith and Constantine Samaras},
  year = {2026},
  eprint = {2611.17098},
  archivePrefix = {arXiv},
  url = {https://arxiv.org/abs/2611.17098v1}
}

See related papersBrowse other papers

Paper preview
Account security

Connect Google account

If you connect a Google account, you can sign in with it too.

Refivu

Delete account

Refivu
Refivu

Sign up