Profile

Settings

Loading…

← Papers

Help

FAQ

Which features require signing in?

You can read the commentary, paper info, Model Structure and related papers of public papers without signing in. Sign in to manage your account or contact us about your inquiries.

Can I upload a PDF file?

Upload papers with an arXiv or DOI link; the commentary is public to everyone. Papers whose source and terms of use can't be verified, so the commentary can't be made public, can't be uploaded. Uploading PDF files and keeping papers private are for subscribers only, and a paper uploaded as a file is saved as private only. Searching for official info by title runs only when you press the button.

Are the figures and AI commentary accurate?

Figures come only from the original paper, and only those whose terms of use are verified are shown. The commentary is written by AI and may be wrong. Check important claims, numbers and figure context against the evidence in the original paper.

I want to report a copyright issue.

Terms of use and the source of the original paper are on the Paper info tab. If there's a problem, choose "Paper content, figures and copyright" under Contact us and send the paper link, the part in question, and evidence that you hold the rights. Receiving your report doesn't confirm any rights or remove anything right away. You can see the result of the review under My inquiries.

I forgot my password.

If you signed up with email, use Forgot password in the sign-in window to reset it with your verified email. If you signed up with Google, Naver or Kakao, change your password with that service.

What should I include in an inquiry?

Tell us which screen you were on and what you were doing when the problem happened, along with the paper link. Don't include personal information such as passwords, API keys, verification codes or phone numbers. Inquiries and replies are stored in Refivu and you can see them under My inquiries.

How do I delete my account?

In Settings, under My account, press Delete account. Review what will be deleted and complete identity verification to delete your account. For other requests, choose "Account" under Contact us.

Paper commentary

cuRoboV2-Fast: Fast Torque-Limited Collision-Free Motion Planning

TimeOpt retimes planned paths for faster torque-limited motion

  • Problem Planners optimize path shape but ignore actuator limits, so a short path can still run slowly. Carried payloads change the dynamics, so timing along a fixed path matters too.
  • Method cuRoboV2-Fast refines a B-spline path on the GPU, then TimeOpt sets the speed along that fixed path. TimeOpt respects velocity, acceleration, jerk, and torque bounds.
  • Results At 3 kg on RTX 5090, mean planning time is 4.43 ms, against 65.13 ms for cuRoboV2. Motion duration is 5.8% shorter than cuRoboV2 across payloads.

Why geometry alone doesn't set execution time

A planner has two costs to control: the time to compute a trajectory and the time the robot then takes to run it. Carried payloads change the dynamics, so a motion that is feasible without load can become infeasible once an object is held. A shorter geometric path doesn't guarantee a shorter run, because actuator constraints can force slower motion along it.

Uniformly rescaling the timestep doesn't fix this, since the limiting constraint changes with configuration.

The authors split the work into two stages, geometry first and timing second. B-spline optimization refines the path shape with fewer iterations, and TimeOpt then sets the speed along that fixed path. TimeOpt optimizes traversal speed while respecting velocity, acceleration, jerk, and torque bounds. In their convergence benchmark, the B-spline formulation matched the success of cuRoboV1 with 25 initial iterations, where cuRoboV1 used 125.

How the parallel RRT supplies a route seed

The planner builds its route seed with a bounded bidirectional RRT, but only when a straight-line seed is insufficient. Each extension draws a configuration, finds its nearest tree node, and steers a bounded step toward the sample. The planner checks each step against joint limits and self and world collision before accepting it. Accepted endpoints join the active tree, including the valid prefix of a blocked edge.

The opposite tree then tries to connect to them, and parent chains recover the route once the trees meet.

The implementation runs growth in synchronized rounds, whereas pRRTC lets GPU blocks grow their trees asynchronously. Its nearest-node kernel tiles the tree and spreads distance work across stored nodes and joint coordinates. A parallel scan gives each accepted endpoint its own storage slot, so inserts don't need an atomic reservation per slot.

The planner checks sampled states on all proposed edges together, which keeps validation separate from the growth kernels. CUDA graphs replay growth operations, which cuts repeated dispatch overhead.

On 2,575 coarsely checked queries from MotionBenchMaker and MPINets, the RRT reached 98.68% initialization success. That compares with 91.92% for cuRoboV1 PRM and 88.27% for cuRoboV2 PRM. Against pRRTC, the RRT is 1.48× faster, while pRRTC reaches 99.07% success at 0.450 ms. VAMP plans in 0.0573 ms at 99.22% success, but VAMP + TOPPRA has lower success with payloads than the authors' pipeline.

Why local spline support keeps gradients cheap

Each sample of a uniform cubic B-spline depends on only four controls, so both evaluation and gradient work stay local. Each sample-joint pair runs on its own GPU thread, which computes position, velocity, acceleration and jerk from those four controls. Adjacent threads take adjacent joints, so memory accesses coalesce. More samples add parallel evaluation work without adding any optimized controls.

The backward pass runs the same mapping in reverse: each control gathers gradients only from the samples inside its support. The gradient is the sum over samples and derivative orders of the transposed sample matrices times the sample gradients. \[ \nabla_U L = \sum_i \sum_{r=0}^{3} \left(A^{(r)}_i\right)^{T} \nabla_{q^{(r)}_i} L \] The kernel applies the basis weights directly instead of building each matrix, and a warp reduction combines the lanes before one lane writes the control gradient.

This avoids atomic adds from overlapping samples and avoids a sample-by-control intermediate tensor.

In a convergence study on 100 MotionBenchMaker cage_panda queries, cuRoboV2-Fast reached 93% validated success with 25 initial L-BFGS iterations. cuRoboV1 reached 64% under the same single-attempt setting and needed about 5× as many initial iterations to match that rate. Dynamics and particle optimization were disabled in that run, and raising the initial budget to 200 added only three percentage points.

TimeOpt keeps the path and retimes the motion

TimeOpt keeps the fixed position spline and changes only how fast the robot moves along it. It models the squared path speed as a second cubic B-spline over path progress s, with timing coefficients r as the decision variables. Positive coefficients keep the squared speed positive, so forward traversal stays defined along the whole path. The objective averages inverse path speed over uniform samples, which approximates the total duration.

The timing spline maps path progress to time, and velocity, acceleration, jerk and torque bounds apply at the sampled points.

Figure 4: TimeOpt schematic. (a) The position spline and its control points ui
remain fixed; purple markers indicate positions at path knots. (b) Optimizing
coe…

Fig. 4 . TimeOpt schematic. (a) The position spline and its control points ui remain fixed; purple markers indicate positions at path knots. (b) Optimizing coefficients ri changes the squared path speed xr(s). (c) The resulting time map assigns unequal traversal times to the same path intervals. In this example, slower traversal through the shaded region and faster traversal elsewhere reduce the total duration.

Original paper · CC BY 4.0 · Balakumar Sundaralingam, Adithyavairavan Murali, Stan Birchfield · cuRoboV2-Fast: Fast Torque-Limited Collision-Free Motion Planning · Original paper figure · Extracted the figure area from page 4 of the original PDF.

Torque depends on the squared path speed through an exact affine relation, so the inertial terms need computing only once. Three inverse dynamics evaluations per path sample give the gravity term g and the coefficient vectors A and D. The authors follow the standard fixed-path dynamics reduction used in TOPPRA, so later timing updates skip repeated inverse dynamics.

The solver is a primal–dual predictor–corrector method that updates the timing controls r and the positive multipliers λ. The predictor targets zero complementarity, while the corrector balances those products to keep the search in the interior. Local spline support gives banded Newton systems, and both search directions reuse one Cholesky factorization.

Backtracking keeps the shortest step that satisfies the nonlinear bounds, and the final trajectory still gets sampled actuator and collision checks.

Adding TimeOpt raises the total reduction to 20.3%, a further 15.7% beyond the refined trajectory. Longer refinement schedules improve motion duration after TimeOpt by less than 0.2%. TimeOpt's mean latency is 0.28 ms on valid 100 g benchmark queries on RTX 5090. TimeOpt targets a local minimum, and it doesn't guarantee global optimality.

Which robot computations got cheaper

Robot computations got cheaper because the code prepares topology-dependent data once and shares intermediate results across them. The forward pass drops dense 6 × 6 transform matrices and uses rotations and translations directly. The analytical backward pass maps torque-loss gradients straight to q, q̇ and q̈, then to spline controls through Eq.

2. It skips the full configuration and velocity derivative matrices that GRiD returns, which cuts both derivative compute and output storage.

Inverse dynamics takes about half the time of cuRoboV2 and stays updatable at runtime for inertial parameters. Combined forward and backward inverse dynamics takes 19.38 µs on RTX 5090, versus 31.58 µs for cuRoboV2. Forward and backward kinematics run 1.1× faster than cuRoboV2 on Franka and 1.3× faster on G1. The Jacobian gains are larger on G1, where the implementation is 1.6× faster than cuRoboV2 versus 1.2× on Franka.

Self-collision builds one AABB per link on the fly from the current sphere positions and padded radii. Pairs of links whose boxes don't overlap skip all sphere-sphere checks, which cuts the detailed pair tests. Swept world collision uses bounds that include the sphere radius, activation margin, and adjacent half-segments to reject distant cuboids.

The per-iteration speedup on RTX 5090 is quoted as 2.7× in the contributions and 2.8× in the trajectory results. Each iteration on Jetson AGX Orin is 2.6× faster than cuRoboV2. cuRoboV2-Fast evaluates 972 robot states per iteration, instead of cuRoboV2's 1,296. The cost is flexibility, because the schedule stays valid only while the reduced topology is unchanged.

Explicit Jacobians are built only when IK needs them, while trajectory optimization consumes the loss gradients directly.

Payload results and planning time against baselines

Under payload, the authors compare cuRoboV2-Fast with cuRoboV2 and with two pipelines that retime the path with TOPPRA after planning. cuRoboV2-Fast and cuRoboV2 reach similar success across payloads, above both TOPPRA pipelines. At the heaviest payload, cuRoboV2-Fast keeps a 14.5–15.7 percentage-point advantage over those two TOPPRA baselines.

Both V2 methods stay ahead of the TOPPRA baselines at 5 kg, where success falls for every method.

Its joint-space paths run 0.8–4.2% longer than those of cuRoboV1 + TOPPRA. So path length alone doesn't predict execution time under these actuator limits. Relative to cuRoboV2, cuRoboV2-Fast produces a 5.8% shorter mean motion duration across payloads.

At 3 kg on RTX 5090, cuRoboV2-Fast takes 4.43 ms, 14.7× faster than cuRoboV2 and 10.0× faster than cuRoboV1 + TOPPRA. On the same panel, cuRoboV2 measures 65.13 ms and cuRoboV1 + TOPPRA measures 44.10 ms. VAMP + TOPPRA plans 1.7× faster than cuRoboV2-Fast. It reaches 2.61 ms, but its success is lower and its timing excludes IK. On Jetson AGX Orin, cuRoboV2-Fast takes 25.99 ms, 23.2× faster than cuRoboV2.

That Jetson time is 5.9× faster than cuRoboV1 + TOPPRA's 152.30 ms on the same device. Even on Jetson, cuRoboV2-Fast beats the 44.10 ms that cuRoboV1 + TOPPRA reaches on RTX 5090.

The optimization loop is 11.0× shorter than cuRoboV2 on RTX 5090 and 10.5× shorter on Jetson AGX Orin. Each iteration runs 2.8× faster than cuRoboV2 on RTX 5090. Two effects compound here, because cuRoboV2-Fast runs 75 iterations where both baselines use 300. Per iteration, cuRoboV2-Fast evaluates 972 robot states instead of 1,296.

What the planner gain means on the YAM robot

Planning is a small share of the YAM pick-and-drop cycle, so the planner's speed only partly reaches the full cycle. For cuRoboV2-Fast, each completed cycle splits into planning, arm motion, gripper motion and other processing, averaging 0.06, 3.75, 1.53 and 0.60 s. Planning accounts for 1.0% of cycle time over 53 completed sequences, including failed planning calls and retries.

Arm execution accounts for 63.1% of cycle time, which makes arm motion the dominant term in the cycle.

On the real robot, cuRoboV2-Fast reduces mean cycle time from 9.07 s with cuRoboV2 to 5.93 s, a 34.6% decrease. Mean arm execution time fell by 44.8% across about 50 completed cycles for cuRoboV2-Fast and 15 for cuRoboV2. The shorter arm motions come from higher velocity use, since the share of arm time at 90–100% velocity utilization nearly doubled.

The perception and grasp stages take 7.69 ms for perception and 1.67 ms for mapping on one RTX 6000 Ada. Grasp motion planning takes 23 ms in the same deployment, and SceneFields builds a TSDF with 5 mm voxels for GraspGenX. SceneFields also builds an ESDF with 20 mm voxels that cuRoboV2-Fast uses for collision checking. In the simulated five-cube tray task, mean planning per cube was 26.05 ms for cuRoboV2-Fast, versus 290.76 ms for cuRoboV2 and 330.96 ms for cuRoboV1.

Mean planned motion was 3.33 s for cuRoboV2-Fast, compared to 4.54 s for cuRoboV1 and 6.24 s for cuRoboV2.

Limits

TimeOpt converges to a local minimum, and the authors don't claim global optimality for its timing. The 15.7% gain is measured against the refined trajectory with uniform timestep rescaling, not against an optimal timing law.

The real-robot comparison rests on approximately 50 completed cycles for cuRoboV2-Fast and 15 for cuRoboV2. The passages report no spread around the 34.6% cycle-time decrease, so its variability is unknown. The convergence study covers 100 cage_panda queries, each run with a single attempt. That study ran with dynamics and particle optimization disabled, so it doesn't show their effect on success.

The 1.7× planning-time advantage of VAMP at 3 kg excludes IK from its timing, so it isn't measured on the same basis. VAMP also achieves lower success than cuRoboV2-Fast in that comparison. IK feasibility alone doesn't establish that the robot can reach the selected grasp pose along a collision-free path.

The 1.0% planning share comes from one real-robot deployment, so it doesn't show how planning weighs in other setups. The Jetson AGX Orin timings are computation and planning measurements, while the real-robot deployment ran on RTX 6000 Ada. They didn't run the real-robot cycle on Jetson AGX Orin, so embedded cycle times remain untested.

Paper info

Authors
Balakumar Sundaralingam, Adithyavairavan Murali, Stan Birchfield
Venue
arXiv · Preprint
First published
2026-11-4
Added
2026-11-6
Updated
2026-11-4
Version
v1
arXiv
2611.06913
Category
cs.RO
Original paper terms
CC BY 4.0
What we show
Paper info, commentary and permitted figures from the original paper

AI commentary is a separate explanation from the original paper and may contain errors. The original paper and figures follow each source's terms of use and any rights noted separately.

Abstract

We present cuRoboV2-Fast, a GPU-accelerated planner that reduces both planning latency and execution time for collision-free, payload-aware, torque-limited motions. B-spline trajectory optimization reduces the required iterations, while accelerated robot computations and differentiable inverse dynamics reduce refinement cost and accommodate changing payloads. TimeOpt optimizes traversal speed along the fixed path under sampled velocity, acceleration, jerk, and torque constraints, exploiting local spline support to solve banded Newton systems efficiently on the GPU. With a 3,kg payload, cuRoboV2-Fast achieves 4.4 ms mean planning time on RTX 5090, 14.7x faster than cuRoboV2. Our method on Jetson AGX Orin plans faster than cuRoboV1 + TOPPRA on RTX 5090. A stereo-camera-based deployment on YAM achieves 5.93 s mean completed pick-and-drop cycles, 34.6% shorter than cuRoboV2. Code (Apache 2.0): www.github.com/NVlabs/curobo , Project Page: www.research.nvidia.com/labs/lpr/curobov2-fast .

Quote from the paper

Balakumar Sundaralingam, Adithyavairavan Murali, Stan Birchfield (2026). cuRoboV2-Fast: Fast Torque-Limited Collision-Free Motion Planning. arXiv:2611.06913v1. https://arxiv.org/abs/2611.06913v1

BibTeX
@misc{sundaralingam2026curobov2,
  title = {{cuRoboV2-Fast: Fast Torque-Limited Collision-Free Motion Planning}},
  author = {Balakumar Sundaralingam and Adithyavairavan Murali and Stan Birchfield},
  year = {2026},
  eprint = {2611.06913},
  archivePrefix = {arXiv},
  url = {https://arxiv.org/abs/2611.06913v1}
}

See related papersBrowse other papers

Paper preview
Account security

Connect Google account

If you connect a Google account, you can sign in with it too.

Refivu

Delete account

Refivu
Refivu

Sign up